PORT INFORMATION | BAYOVAR - General
Restrictions
Picture Library
Video Library
Nautical Chart

Latitude: 4º 47' 00" S
Longitude: 81º 03' 20" W
Port Location and Influence Area:
The port of Bayovar is operated by state company “Petroperu” Petroles del Peru. Bayovar is located in Sechura district - Piura department, on the North-West Coast at 1,000 Km from Lima city. The nearest city of Piura is located 120kms from Bayovar and connected by paved road.
Crude is pumped trough a pipeline from the amazon, the total section of pipeline is named "Oleducto Nor-Peruano", which has been described as one of more complex engineer project in the world. It has 856 kilometers length on it`s main section that born in the amazon and ascends through mountains up to 2,400 meters height, then descends across Sechura desert to finally arrive at the port of Bayovar, where crude is loaded on tanker ships for subsequent sea-transportation to Petroperu`s main refineries in the coast, such as Talara and Conchan.
Port / Harbour Description:
The Bayovar terminal is "T" shaped jetty which consists of a small installation with 200 meters length that extends from the coast and ends on transversal berthing front of about 150 meters length specially designed for tankers ships.
No breakwater as this is a natural sheltered harbour. Winds sometimes blows with 4-5 force coming from land. However there is a constant swell with moderate intensity which always affect vessels at berth.
Upon arrival, vessels usually drop anchor at pilot station, where pilot and port authorities come onboard to comply with reception formalities. Pilot station is located about 2.7 miles NE direction from Punta Aguja, depth at boarding area between 22/26 meters. Five light buoys have been installed within entrance channel so as to help vessels when approaching to the port.
Berth description:
The terminal Jetty is designed for taker ships up to 250,000 tns. Vessels always moored portside to, except under contrary orders given port administration. The crude is loaded by gravity from shore tanks at rate depending of ship`s requirement and quality of product. For this purpose the loading platform is fitted with four loading hydraulic arms with capacity of abt 25.000 barrels per hour (each loading arm). They can be operated in individual form or combined, without causing any interfere in connection with inactive arms.
The loading platform also equipped with a control building, four berthing defenses and four dolphins connected between each other by metallic footbridges, which extend the berthing installation to a length of 490 meters. Each defense is well equipped with mooring hooks and electric capstans so as to assist good securing of mooring lines.
Concentrates are loaded by means of conveyor belt which comes from the depot situated at alto Matarani (50 mtrs. above sea level) and abt 800 mtrs away from the main gate. The conveyor end can be shifted in a range of about 80 to 90 mtrs, for which bigger vessels have to be shifted during loading in order to reach extreme holds.
Port Restrictions:
DWT From 16,500 to 250 000 TN
LOA From 160 to 330 mts
Beam From 160 to 330 mts
Draft From 9 to 20 mts
Pilotage:
Compulsory and provided by Petro Peru. Service is requested through Petroperu`s attending agents.
Tugs:
2 tug compulsory. The tanker ships are assisted during berthing or unberthing manouvers by two tugboats. Additionally one small boat to support transference of mooring lines and secure them to defenses and dolphins.
  Tug "Punta Bappo" 2,970 hp
  Tug "Oro Negro" 1,800 hp
Storaged Capacity:
There are 14 tanks to store the crude pumped through stations of the pipe line. The tanks installations are located 165 meters above sea level, which allows loading the crude about gravity.
Tank Number
Capacity
11D1
22380 m3
11D2
22380 m3
11D3
22380 m3
11D4
22380 m3
11D5
22380 m3
11D6
22380 m3
11D7
22380 m3
11D8
22380 m3
11D9
22380 m3
11D18
22380 m3
11D19
22380 m3
11D20
22380 m3
11D21
22380 m3
11D22
22380 m3
Working Hours:
The port works 24 hrs / day. However, overtime hours is charged on Sunday and Holidays only.
Usual Loading Rates: (Qttys. aprx.)
The loading rate is 25,000 bls per hour on each of the 4 loading arms, making a total capacity of 100,000 bls per hour. However, normally only 2 or 3 loading arms are used at a time
Port Facilities:
Bunkers
No
From Talara
Provisions - Stores
No
From Piura
Dry dock
No
---
Airport
Yes
Piura
B.A. chart
Yes
1213 (National chart)
Fresh water
Yes
---
Repairs
No
---
Medical attention
No
From Piura
 
 
 
Disclaimer:
All information available in this site, specially in connection with Peruvian ports, has been obtained from public domain sources, port administrations and our own records. Said information is given in good faith and without guarantee. SERPAC AGENCIAS accepts no responsibility for any misunderstanding or variation of said information.